Settled the entire obligation to Novi Sad Heating Plant under the Agreement on the participation and the Agreement of design and construction of warm-water connection our facility. ...
24.07.2012.
In accordance with the study of energy efficiency of our facilities, thermal insulation of the attic is performed by using mineral wool. Details of development of thermal insulation in attic can be ...
23.07.2012.
During the painting works at our facility. Attached you can see how the machine performs smoothing of interior ...
16.07.2012.
It began performing of plaster, painting and facade works of the building.External thermal insulation layer is performed by the principle demit facade, with the use of Styrofoam plate d=12cm, instead ...
15.06.2012.
Works is in the progres on the installation of cement screed in the building. Screed is done over the hard polystyrene d=2 cm and PVC foils. Details of these works can be seen ...
30.05.2012.
Works is in the progres on the heating installations in the building. Few details about these works can be seen ...
12.04.2012.
A few photos and a video machine plastering the interior surface can be seen ...
30.03.2012.
On 21.03.2012. began plastering of interior surfaces the building. For edge slats are used by the window edge molding quality of the "Protector", which were used as guides for ...
23.03.2012.
Since the avoidance of doubt, what are the coefficients of heat transfer for the carpentry for the newly adopted materials for doors (PVC profile is aluplast, IDEAL 400, k = 1,3 ; ...
13.03.2012.
More information about offering smart installation, see ...