News
11.11.2011.
Of doc. dr. Aleksandar Rajčić from the Faculty of Architecture, commissioned a study of energy efficiency, to improve the energy efficiency of our building. The text about it will be subsequently ...
01.11.2011.
After concreting the last plate, they are now making concrete structures for the reception of the wooden roof construction. Attached is a photo where you can see the preparation ...
27.10.2011.
Today is concreted the last plate on the building, duplex plate. For its concrete spent 72 m3 pumped concrete, 30 mark, with 4 ...
13.10.2011.
Testing of concrete compressive the strength performed on samples - concrete blocks 20x20x20 cm dimensions. The rating obtained concrete is based on strength of concrete at the ...
11.10.2011.
Today, the pillars and walls concreted floor. For this concrete spent 21 m3 of concrete pumped, 30 marks, with three ...
03.10.2011.
Investor base in Novi Sad (with basic information about the location and inspection of the official list of sold flats) can be viewed at: ...
30.09.2011.
Today is concreted and attic floor board. Concreting of the slab spent 67 m3 of concrete pumped, 30 marks, with three fractions. Details can be found ...
23.09.2011.
Today on the web portal "eKapija" published an article about us. Complete text in article can be read ...
19.09.2011.
As part of the Business Registers Agency began to register the injunction, and will be avaible to citizens in the future before buying an apartmant or a car cheking whether the ...
14.09.2011.
The building is slowly takes shape in the exterior. Enclosed is a photograph of the 3D model in the exterior, as well as photographs of real object at this stage (14.09.2011). ...


