News
17.02.2011.
On 17.02.2011. received the invoice the Department of City Development and Construction for communal equipment of our location. There are two ways to settle this obligation, the ...
14.12.2010.
14/12/2010. officially submitted the request the Departure of City Development and Construction for the calculation of compensation for urban ...
25.11.2010.
City Administration for Urban Planning and Construction, with its seal on the main project confirmed that the same was done in accordance with the issued urban conditions and location permit, wich ...
12.11.2010.
After making the main architectural project, by the renowned architecture office, (Kuzmanov&Partners), all in accordance with the urban conditions, and after compliance with the investor, the ...
25.10.2010.
Interior Ministry, Emergency Situations sector, launched a petition calling for a redefinition of ...
25.10.2010.
Ministry of Interior, Department for Emergency Situations issued redefined conditions for construction of shelters, by wich the future tenants of the building,. Stanoja Stanojevića no. 8 power in ...
22.10.2010.
Following the identification of investors built the building in no. &, "Graditelj NS", was asked to consent to the residents of the newly designed building no. 8 can be in ...
13.10.2010.
Obtained a Location permit, (under the new law on planning and construction in September 2009.), the first important document on the way to obtaining a building permit, after which they will only be ...
23.09.2010.
Requested and obtained the expert opinion of a reputable institution, the Institute of Security and Safety at work, by whom it is possible that the capacity of the shelter in a ...
21.09.2010.
The technical conditions for the project documentation broadcasting installations, from the Radio Television of ...


