Setting up module for smart installation system
25.01.2013.
Images constructed facility
25.01.2013.
Setting classical parquet
06.11.2012.
Installation of sanitary ware in the bathrooms
02.10.2012.
Making interior plaster coating
28.09.2012.
Final roofing-metal works
27.09.2012.
Making waterproofing terrace
16.09.2012.
The final phase of work on the facade
06.09.2012.
Work on warm-water connection and the substation
04.09.2012.
Thermal insulation of attic
24.07.2012.
Machine smoothing
23.07.2012.
Creating demit facade
16.07.2012.
Installation of cement screed
15.06.2012.
Works on the heating installations
30.05.2012.
Machine plastering of internal walls
12.04.2012.
A sample of pvc joinery
05.03.2012.
Electrical installations
02.03.2012.
Building the walls
13.12.2011.
Installation of roof windows
10.12.2011.
Covering the object
01.12.2011.
Making wooden roof structure
19.11.2011.
Concrete slab attic
30.09.2011.
The form object in space
14.09.2011.
Concreting of the third floor plate
06.09.2011.
Concreting of the second floor plate
17.08.2011.
Concreting of the first floor plate
01.08.2011.
Reinforcement slab of the first floor
30.07.2011.
Concreted zero plate (ground floor plate)
12.07.2011.
Mound of sand between the foundation walls
05.07.2011.
The foundation walls and pillars
04.07.2011.
The base plate concreting
24.06.2011.
Installation of reinforcement for the base plate
17.06.2011.
Determined the exact position of an object in space, arrived the first shipment of concrete armature
16.06.2011.
Thin layer of concrete
15.06.2011.
Embankment foundation pit with gravel
14.06.2011.
Backfiling the excavation works on iberlauf
11.06.2011.
Excavation of land for a base plate
08.06.2011.
Start of preparation works
06.06.2011.
Excavation of earth for retaining wall
30.11.-0001.